This $24 million project included construction of a dam and reservoir to supply water for the Parker Water and Sanitation District. The project included bid package #6 – Earthwork and Utility Construction. The perimeter of the reservoir is two miles around and included over 6.6 million CY of earthwork. The utility construction included large diameter welded steel pipe.