This project involves the replacement of the historic Holtwood Road Bridge, all all-timber bridge that was built in 1935, with a new reinforced concrete girder bridge. The bridge replacement is a new two-span concrete bulb tee girder bridge with an eight-inch concrete deck. The structure will measure 218 feet in length and 35 feet in width, and will feature four girdler lines of BT54 Prestressed Concrete Girders.
Back to Projects